The Qube demolished the 2 existing structures and replaced with a generous 247m2 SIP building that consisted of 2 open plan classrooms, 7 toilets (including disabled facilities) as well as a number of kitchen facilities for food preparation. The cladding finish, with a generous decked area and veranda was a great match for the vision for the school.