Free E-Brochure

Location

Aylesbury

Services

6th Form Block

Size

150 m2

Project Length

9 weeks

The Brief

To provide The Grange School with an expansion solution for their 6th form students. The school needed extra space for this age group and a single classroom block was the perfect for the space on the school grounds.

The Solution

The Qube designed a building which ticked all the boxes when it came to meeting the clients’ exact needs. With the number of challenges that school environments face, including space, construction interruption, costs and more, The Qube provided a 6th form centre , quickly, conveniently, and affordably for the client.

The Outcome

This modern, spacious and energy-efficient classroom was constructed off-site in a factory setting before being transported to the school location for quick assembly.  This classroom block was customised to meet the specific needs of the school , and can be easily expanded if necessary. the Qubes modular classrooms was designed to match the look and feel of traditional buildings, with a variety of exterior finishes.